Saturday, April 26, 2008

Salesman's Visit

The siding salesman visited this morning. Before he arrived though, Rachel and I started a number of chores. The biggest was burning debris that we had piled up from the ice storm in December. The stuff was ten feet high and in the past, it was always too wet or too dry or too windy. It was just right this morning, so we got the fire going.

The salesman wanted full payment, but Rachel stuck to her guns (I was manning the fire) and said that the cap needed to be addressed first. They inspected the siding job and she took him up on the roof so that he could see how the cap was done. He agreed that it didn't look like a good job.

He made a bigger deal out of the fact that the guys left scrap, trash, etc. He went around and picked up a bunch of it. We agreed that we would pay about 90% of the balance, but that the last amount was held back until they do something about the cap. The salesman took pictures so that he could return to the office and discuss the matter with the company vp.

After he left, Rachel and I made a quick trip to get 6 40lb bags of manure for the gardens. We worked in the gardens most of the afternoon, although I did get some mowing done, and I also worked a tiny bit on the house. I put some plastic on the end of the pex we have out in the patio, to protect it from the UV rays. I need to protect the water supply line as well, but I'm hoping to do that with some pipe insulation (which we need anyway).

I'll be interested to hear back on what the vp of the siding company will agree to do. We feel that it is only right that the cap be done as we had been told it would be done from the beginning. That only seems fair.

I feel badly that the guys that installed the siding might have to return to finish the job. This will not make them happy workers, and because of the trash that the salesman picked up, they'll probably get some scolding over that. And we have no complaints with their work, other than the cap isn't what we'd originally agreed upon.
I just hope that if the same guys have to return to redo the cap, that they're not the type that will vandalize. We just want to have the job done the way we agreed on having it done, and paid to have it done. (and we didn't want to get anyone in trouble over it).

Thursday, April 24, 2008

The Parapet Siding Is Done (but it's not as good as it should be)

The parapet siding is done, but not like we had understood it would be. For pictures, click here.

The guys finished, but after they left, I walked up on the roof to see it closer. The first thing I noticed (and Rachel agreed) is that the cap is wrong. It's in two pieces, not one. That cap is supposed to be a single piece that starts in front, goes over the top, and then down the back side of the parapet for a couple of inches.

At first, they incorrectly put a white cap up (but only for about 20 feet). They ran out of material and then figured out that it was the wrong color. The white cap was one piece. It looked good. We liked how it sloped down the retaining wall a couple of inches. When they replaced the cap with the right color, for some reason, the material is the right color, but it appears to be slightly different and they had to cap in two pieces.

Rachel was even more disappointed when she saw the cap. We also didn't like how they did it at the end where it's supposed to lap over the top of the retaining wall a couple of inches. This second time around, they didn't do that. It looks unfinished from the end. You can see the wood underneath the front of the cap. I'm not pleased.

The salesman called and he wants to come by on Saturday and get final payment. Rachel told him that she doesn't feel comfortable paying until the job is "finished". I guess we'll talk about it Saturday morning when the guy visits. Clearly, what we originally discussed with him, is not what we got.

I can tell you that as parapets, and from what people will see, the siding is fine, but now, with what we know, I wouldn't have this siding on the house walls. I don't think it looks good enough. It looks cheap. However, on the parapets, it is fine.

Friday, April 18, 2008

Parapets

The guys returned bright and early to get more siding done on the parapets. They've gotten most of the south side of the house done, and I figure they'll finish that side up tomorrow (they plan to work half a day on Saturday).

The siding looks good. Rachel is happy with it. We've noticed that from down the road, the house blends with the trees now, rather than being very obvious when the white parapets could be clearly distinguished through the trees.

We posted pictures (click here).

I took a lot of pictures today. I also went to a tour through the new BOK Center, which is still under construction. It's of interest to me because my hockey team will be playing there next season. Completion date is set for September 1st, but they've got a long way to go, and the schedule looks tight to me. I hope they can do it.

If you're interested, I posted pictures of that tour too. The link is in the navigation bar to the left. It's "Photos @ Google".

Thursday, April 17, 2008

Parapet Siding

The siding guys returned this morning at 7:00. I opened up the gates and got them started. It was an overcast day, with thunderstorms in the forecast. The storms ended up coming after they left, so we got a day's work in from them (sort of). They left at 15:00. They did take off for over an hour for lunch, so it didn't feel like an 8 hour day to me, but on the other hand, I'm paying for the job, not by the hour, so it doesn't matter to me. The quality of work seems to be good, so I can't complain.

I took a few pictures (click here to see) and hope to get a few throughout the job until they finish in a week or so.

On another note, I called an electrician over a week ago. It's almost been two weeks, actually. The guy never called me back and he hasn't come by. I'm frustrated. I guess business is so good that he can afford to throw work away. I'll call someone else next week so that I can get the electrical work that's needed beneath the slab. I want to pour the slabs in a couple of months.

After the electrician gets his work done, I need to do the duct work for the ventilation system. I also need to install the central vacuum system, the stereo wiring, computer network cable, telephone cable, and security cabling. After that, we can pour concrete and get this house project moving again.

Wednesday, April 16, 2008

Parapets

The siding company had a schedule change and so we got in much earlier than expected (although I was hoping for this all along). Two guys showed up around noon today and started assessing the job. I think what we have scared them a bit. They left for a while and returned with some light lumber for applying to the parapets prior to putting on the siding.

Click here for initial photos.

The biggest problem the guys ran into is that they started putting up some 1x4s and found out that they need longer fasteners. The ones they had weren't getting into the concrete enough to hold. They made it through the insulation, but not enough into the concrete to do the job. So they quit early today, but we figure they'll make up for lost time tomorrow.

From what I understand, it's going to take a week of prep work before they can really start applying the siding. This siding is what we picked for the parapets. We're not ready for work on the walls yet, and Rachel and I still haven't determined if we'll brick the walls or if we want some other type of fascade. We still have time to decide that, but we wanted to go ahead and get siding up for the parapets, because that much we do know. Plus, we were in dire need of protecting the insulation that is on the parapets. They need to be covered.

Saturday, March 29, 2008

Plumbing (Continued)

The plumbers finished the rough-in work. Block Outs were built for places (such as the showers or tubs, where we will have to make fine adjustments for proper location of the drains later. So the block outs will leave a void space in the slab when it's poured, so that the final placement of the drains can be made when it's time to install the showers or tubs.


For pictures, click here.


I paid 50%, plus an additional $600 for the renting of the boring equipment (the giant hole saw). I figure that if we'd ended up not boring a hole through the footing, and went with the sump pump, that by the time it was installed and an electrician hooked it up, the cost would've been pretty close to that same price. I think this is a better solution as we wont need electricity for draining from that garage bathroom.


I wanted to note (and I have a photo of it) that when the original concrete work was done, the concrete guy dumped excess concrete next to the house. They often dump waste concrete wherever they can, and they rarely ask where they will dump it. And for some reason, no matter where they choose to dump it, it'll likely be in an inconvenient spot. It's better if you can be on site to choose. In my case, they dumped concrete right in the path of where I need the sewer line to go. So I'll have to remove that giant globe of concrete. I'm not happy about it, but it has to be done.

Friday, March 28, 2008

Plumbing (Continued)

The plumbers were back today. The hole chewed and chiseled out of the footing was a disappointment. The hole saw never quite did the job and so it was taken back and they continued the job with a drill and a chisel. And then after all that trouble, it didn't look like we could get the slope we needed for the proper flow and we were in danger of needing the sump pump after all.

Well, Mike (the boss) returned with the giant hole saw. He said that he was about to return it when the Hilti guy arrived and had a new "bit" (I don't think of it as a bit. It's a hole saw to me).
Anyway, this saw was different. Not only were the teeth meatier, but they were pronounced from the outer surface of the saw (the cylinder) and so as they cut into the concrete, they leave enough clearance on the sides of the hole not to cause so much friction. This time, they were able to completely saw through the hole and clean it up, in less than half an hour.

Click here to see pictures.

They got a lot of work done today, but will have to return to finish tomorrow morning. There's still some final work to do and they have to pack up their things too, so they quit a little early today knowing they probably have an hour or two left tomorrow.

One thing I wanted to mention is that I like how these guys tie everything done nicely at the base of their stakes, to make sure that when the floor is poured, that the lines remain exactly where they are to be (inside a wall).

I particularly like the pex product. It's much easier to work with than pvc or copper. It's a continuous product, so there's not a lot of glueing, and when fittings do need to be done, they are very tight and secure. There isn't a high rate of failure in these fittings. It's a good system and I like how fast they are at using the material.

When they're finished, one thing they are going to do is plug every line and then test for leaks with air pressure. I have confidence that when they leave, the job will be 100% complete and reliable.

Thursday, March 27, 2008

Plumbing

The plumbers arrived this morning and I worked with them all day. It was past 19:00 when they finally left. I was beat. They made fast work, plumbing everything except for the kitchen and for the garage bathroom. We would've gotten that done, but it was taking so long to cut a hole through the footing for the sewer line.

The original sewer line hole that Terra-Dome provided us was in the wrong location from where I had specified, and it was way too low to allow for proper flow from the toilet. So rather than dig through the rock for a sump pump, we chose to bore a hole through the footing to provide for the proper drainage without the need of a sump pump.

Even with the giant hole saw machine that they rented, they were only able to cut about halfway through the footing and then there was just too much friction on the sides to allow it to cut further. We drilled through several times from both sides with drill bits, and hope to finish tomorrow morning.

One change order (already) is that Rachel wants a sink out on the patio, so we need to get hot and cold water back there, and plus she wants hot and cold water for a hot tub (some day). I mentioned it to the lead plumber late in the day and suggested that if we could just branch off the hot and cold in the garage, that there's a place in the footing that I provided to allow them out to the patio. He didn't seem to think this would be a problem.

Click here for pictures.

I was a bit embarassed that we had so much trouble with the garage sewer drain issues. It seems like everything we do isn't just off the shelf. We seem to be "out of the box" and it always seems to take extra time or extra money or both.

Wednesday, March 26, 2008

Working With Sand

After all this discussion with the plumber, he finally told me yesterday that he needs sand, not gravel, as a base to work in. I kinda figured that before, but Jay Scafe (Terra-Dome) told me they always use gravel below their slabs. I think that's for their convenience, not for the convenience of the home owner. It makes sense that copper or pex are more vulnerable to gravel than with sand.


So I had 4 loads of sand delivered today and raced to get it into the house and approximately to the height of the footings, in preparation for the plumber, who arrives to work tomorrow. On top of that, I was also racing the weather today, as there was a chance of rain and it looked like it could rain at any time. I took no time for breaks. We really can't work with wet sand, and so it was important to get it inside before any rain.


I beat the rain and I beat the clock, but now I'm beat. I am sore.


After Rachel got off work, she helped me smooth out the surface of the sand and pack it down in areas. I did most of the packing with the tractor, but there were areas that I couldn't get with the tractor. We used a hoe and a rake, and went over the entire surface, getting it pretty well.
The four loads of sand allowed me to get the basic areas where plumbing will be. I omitted an area in the master suite because I have stuff stored there that I need to keep out of the weather (paraseal is one item that I'm protecting until ready to use).There's also about half of the great room that I didn't cover (yet). I figure I need another couple of loads to finish out the house, with the exception of the garage. Only the southeast corner of the garage is being plumbed, so that's the only area that I scraped out gravel and put sand in. Hopefully, any pex in there that might be in gravel, will be protected with insulation (which we ought to have with the hot water pex anyway).


One item to note is that the plumber (Mike) suggested that instead of the sump pump in the garage (to account for the grade problem with the sewer line), that instead, for approximately the same price (and less labor on my part), we might get a contractor to bore a 4 inch hole in a more convenient place for the sewer line. I like that idea and Rachel did too when we discussed it this evening.


Anyway, the plumber and his crew arrive tomorrow. He said it would be between 8:00 and 9:00, and he says that it'll take 2 days for the sub-slab work. I'll pay half and then 35% when he comes back to do the top-out work (that wont be until we have framing in). and then 15% upon completion.


I took a few photos (click here) of the work I did today. It's not the most glamorous photographs I've taken, but I figured I wanted to document that I put in a 10 hour job today with only enough break time to use the restroom. I huffed to get it all done in case there is rain.

Tuesday, March 25, 2008

Working with an agenda

I've made a new effort to get moving on the house. Every day, I call and try to talk to various people to get things done. After almost two weeks, I've finally got the siding people (almost) ready to work on the parapets. The thing is, it was almost a week or more of phone tag before finally pressing the issue. I had to tell the assist (yesterday) that I was getting tired and that maybe it would be better for me to double my chances for success by calling a second siding company and seeing which company could get out to do the work first. I received a callback within an hour.


I'm going over to the siding company tomorrow morning to get the contract started, but the sad news is that I was told it could be 10 weeks before they can start. This isn't what I was originally told. However, this is their busiest time of the year; but it's their busiest sales time. This is a sure-thing installation and I've been waiting long enough. I expect to not have to wait that 10 weeks. I better not have to wait even half that time.


I finally got a bid from the plumber. I'd waited over a month with no response from that guy, so I pressed the issue with him and got a $12,800 bid from him yesterday. I've mulled it over with Rachel and intend to go over it with him in person later today (I haven't verified that with him yet, but it's my intension). It seems like a lot of money, but it's for the sub-slab work, plus topping off after the slab is poured. I'm hoping that we can get him on this work real soon.
I think I'll be moving more gravel inside the house to get the sub-slab area to the right depth. With the plumber's help, we've pretty much determined that the sub-slab depth needs to be pretty close to where Terra-Dome recommends, which is the 4 inch slab sitting ontop of the footings. I was hoping to be below that a little bit so that we'd have more head room above the slab. In the end, it's no big deal. It's only 4 inches.


I hope to arrange for more gravel to be delivered, as well as getting a delivery of the cheapest fill dirt (it's a bit rocky). This is great for starting a new berm, which is what we need on the north side of the master suite.


This is what I'm hoping to get going. Once the plumber is doing his thing, I'll probably start my own sub-slab work. I just didn't want to interfere with the plumbing (since it has a set flow that must be maintained)(wiring and central vac do not). I will be running the central vac piping, plus conduit for phones, computer network, stereo, security sensors, etc. There are also the fresh air lines that I want available for the wood stoves and the water heater. (The house is very tight, so we need these fresh air intake lines).


Once I have all that, I'll determine if I want to do the electrical lines or if I'll call in an electrician. Considering that the last time we paid an electrician, he didn't do what we wrote out for him to do, I figure I'll probably run these conduits too. At least then I'll know that I'll get the lines where I want them to be and I wont be paying $50 (or is it $70, I can't remember) an hour to get it done.