Thursday, July 1, 2010
I Quit
I figure that I'll change my mind this fall, but for the summer, I'm done.
I have tried for over a month to get the sand that I need to continue work. I'm wanting to get this in the area where I can level it out over our utility lines and pour a slab for the floor.
It took 2 weeks because of weather and because of an unreliable dirt contractor. At first, the issue was that the sand was wet and so he couldn't deliver a full load because of the weight of the truck. I understand that but when it dried out days later, he kept saying they'd deliver the next day and didn't. After repeated calls, finally, 2 weeks later, it was delivered, and it was mostly clay, not sand like I had asked.
He had decided (for me) that although I asked for sand, what I really wanted was this stuff. He'd asked what I was doing to use it for, and he decided that he knew better what I needed.
So I asked for another load of sand and over 2 weeks later, it got delivered this day, and it was the same stuff as before. Crap!!!
I've been looking in the phone directory for another supplier in the area and there aren't that many. I finally got a hold of one this morning and the first thing he asked when I told him what I wanted as "what are you going to use it for?" I replied, "Never mind" and I hung up the phone.
I'm done. I've paid $260 dollars for clay that is of no use to me right now. Once it is dumped out of their truck, it's not like I can scoop it back up and send it back with them. I just can't seem to get the material I want, and I'm unwilling to use their clay for my application. I've tried. I've honestly tried.
My problem in the floor is that I spread the stuff and then try to compact it, but it sticks to the tamping tool that I use to compact it with. So I can't get a good level surface. It's taking me 3 to 4 times as long to get a level area for the slab, and I'm doing the work alone. I have no help. So I'm done. I quit. I don't know if I will resume work or not. It's quite possible that this house will never be completed. However, it's also possible that I will have a change of heart in the Fall. Right now, it's hot out there on the site, and I'm tired of struggling with inferior product, and I can't get the product that I repeatedly ask for.
Tuesday, June 29, 2010
Slow
Friday, July 17, 2009
Poured the Garage floor (finally)
Our goal right now is to get the garage closed in, so that we have a secure place to store tools and materials. We'll pour the slabs for the rest of the house after I finish the utility work that is needed below those slabs.
Saturday, January 3, 2009
Earth Tubes
See our photos on Flickr.
Sunday, October 12, 2008
It Doesn't Feel Like Much Has Been Accomplished Lately
Monday, September 15, 2008
Nothing Got Done This Weekend
Tuesday, September 9, 2008
Worked On the Utility Trenches. Worn Out.
The jackhammer made the work go faster, but I worked hard having to pick the machine up and move it around. The boulders had to be cut through though, and this area of the property probably has the biggest boulders we have. They were thick and wide.
At the end of the day, Rachel asked me if this was the right tool for the job. I said that "for this job" it was, because of having to be careful and not damage existing utility lines and the well. However, if it hadn't been for those, the right tool for the job was a backhoe.
Tuesday, September 2, 2008
August Was a Slow Month
Anyway, there was the grand opening of the BOK Center in Tulsa. I took a few photos. (Click here to see). That was last Saturday.
I'm back on the utilities chore and feeling the need to get this done so that we can berm some more (and that area will be buried, so it's important to get the utilities done first), so we can finish the waterproofing and get the roof covered before winter.
And nothing has been done about the slab or any utilities within the house. I do have all the utilities done in the garage though.
We did some trim work in the current house. After living in the house for almost 4 years, Rachel felt like we should finish some of the trim. So we've done that work and it was easier (and cooler) than working outdoors.
With August behind us, I'm feeling the urgency to get back to work on our new house.
Thursday, August 14, 2008
Why Is It Difficult To Get Contractors?
As it turns out, we pay or are willing to pay, the same as amount as what these guys are getting through their commercial building customers. The difference is that their commercial building customers are a source for repeat business, whereas we are not. Therefore, if they aren't busy, they'll do work for us, but otherwise, we're going to keep getting pushed to the back of the queue as far as when they can work.
So it stands to reason that we've had trouble. In comparing notes with other people I know in the area, who are also building (or have built) their own homes, it has been the same experience for them. The best luck they've had is to pay for day labor and supervise closely.
Saturday, August 2, 2008
Still Rushed but Not Stressed
After further consideration, and talking it over with Rachel, we decided that the money we were going to be paying for waterproofing help, and slab prep, was going to be a whole lot of money for not a lot. It was going to be a lot in terms of progress that I have not been able to make on my own, but it was going to use up the rest of our money and wasn't a lot of value added.
So Rachel decided that she'll help me. We're getting a list of things to do and products to buy, and looking to hire some local help. Our plan is to get the waterproofing done in a weekend in August (before the rains come in the Fall), and get the roof covered as soon as possible. This will be some dirt work. I'll have to buy dirt as well as get someone to help move the dirt we have up against the house and get the berming completed.
Likewise, some local help can get us the slab prep work we need, and with Rachel's help, I can get the phonecalls made, the workers lined out and all the things done that I couldn't do and hold down a job at the same time.
This will save us a lot of money, which I feel a lot better being able to save and spend somewhere else (on the house, of course). Rachel is happier about it. I don't think Ralph Smoot (the guy in the Austin area that was going to help us) is happy about it. He's not returning my e-mails right now and there've been no phone conversations since our decision either.
I had literally planned to get him to do the work up until dinner lastnight after work. I had the contract printed out. I had already given Ralph our address and instructions on how to find the place, so that they could have materials delivered. All that remained was me provide a check and the signed contract, which I was going to Fedex for a Monday delivery.
At dinner, Rachel said she didn't feel comfortable with that decision and felt that it was an awful amount of money for what we'd be getting.
I can definitely say that this was nothing against Ralph or his son Conrad. It was a money issue. I wanted to get the work done, but I didn't like the idea of being out of money afterwards. This way, it'll probably take us longer to get this stuff done, but we'll have the money left to go further on construction than we would have been able to otherwise.
I still haven't gotten a return call from Jay Scafe (@ Terra-Dome) because I had wanted to check and see if he had anyone to help us with the waterproofing, and what they might charge. If it was a better price, we would entertain that solution for certain. The thing is, Jay hasn't returned our calls. He's either out of town, or just not checking his voice-mail yet.
