Thursday, November 1, 2012
2012.11.01 - Catching Up From My Last Entry
Monday, July 4, 2011
2011.07.04 - Windows & Doors
Nearly a week later, nothing had been done by Home Depot and they weren't returning our calls or doing anything about it. That was frustrating.
One of Rachel's co-workers' husband works for Home Depot so he came out and inspected. Normally, he doesn't do that, but he did it for us. He took photographs of the damage. However, after that, we couldn't get any involvement from the store management. This was terribly frustrating.
However, after we started bugging them, I think one of the assistant managers finally got involved and realized that there was a problem.
However, the store manager insulted Rachel (practically) by telling her that he'd give her a $200 discount on the door and was willing to "sell" her some stain for the door at a discount.
Give me a break. The door had a distressed finish, but "come on". Offering to sell us stain was an insult.
So we told them to come get the door. They ordered a new door to replace that one and we're waiting for that.
In the meantime, we contracted with a guy to come out and install the windows and doors. I took off work and was home to help him. We also got help from our son when I got tired of carrying the windows. The double windows were pretty heavy, as were the french doors.
They're all installed. I took a few photographs. We're pretty happy with the quality, and the assistant manager at Home Depot made things right, so we have no complaints with them. We're just waiting on the front door and some screen replacements for the french doors.
Wednesday, May 4, 2011
2011.05.04 - Hoping to Close In Soon
Anyway, progress has been good and we hope to wrap that up this weekend and then be able to put some sheathing over the framed exterior areas. That’ll have us ready.
We still need to address waterproofing on the roof, but it’s been rainy and wet and we’ve just not addressed it. Clearly that’ll be the next step. We plan on waterproofing, and then covering the waterproofing material with old carpet to protect it from the sun. We’ll leave it like that for a while and wait for more rain so that we can verify that our waterproofing job has been adequate. Then we will get the dirt on the roof.
In addition to the basic waterproofing, once we start adding dirt, we will add a liner for additional waterproofing, and grade that so that water will flow off the roof rather than puddle in areas as it does now. And in addition to the liner, we will add some sheet insulation to protect the liner and also insulate in a manner in keeping with the PAHS theory, which will not only provide good waterproofing and insulation, but will also help the house maintain a more constant temperature year round.
Monday, April 4, 2011
2011.04.03 - We hope to make progress this summer
Rachel and I installed hangers in the garage so that we can finally make our "warehouse" a little more useable. The floor space had been used up by various building materials and having the wall set up for storage, this frees up some of our floor space for other things. If we're going to be moving forward this summer, we'll need to utilize our space more efficiently.
We have more to do in the garage to reclaim floor space and store away the materials we have in a better way. Hopefully, we wont allow the storage area to be used as inefficiently as we allowed before.
Hopefully, in a month or so, I should be able to report progress again. We'll see.
Wednesday, October 13, 2010
2010.10.13 - Slab Pour
The pumper truck showed up about 8:30 and the first concrete truck arrived around 9:00. The pour began soon after that.
I photographed and videoed progress during the day (http://www.flickr.com/photos/les_stockton/sets/72157625159403546/). And when all this was being scheduled, Rachel was a bit aggressive and arranged to have an electrician on-site to set up so that it would be easier to use a portable generator to supply a minimal amount of electricity directly to the house, rather than having to string extension cords through the door or through a dryer vent. We were successful on both projects.
Tuesday, October 12, 2010
2010.10.12 - Slab Preparation
The plan is to come in tomorrow morning, finish rebar in the patio (it got too dark to finish this evening), and to form up in a few places. The concrete will go in and they should have it all done tomorrow.
I took my phone camera out there and got a little bit of video (http://www.flickr.com/photos/les_stockton/sets/72157625028000063/with/5077151642/) of the work this evening.
Friday, October 8, 2010
2010.10.08 - Behind Schedule On Floors
Friday, Oct 8, 2010
The concrete guys didn't show up, but they didn't bother to call until 17:00. By then, I kinda had it figured out, but I was glad to at least get the call. Most contractors wouldn't have even bothered to do that at the end of the day.
The current plan now is that they will prep the site on Monday (I hope they can get it all done in one day), and then pour concrete on Tuesday.
2010.09.10 - Back On Track
Friday, Sep 10, 2010
What we're doing now is preparing for the slab. I've done all the sub-floor utility work, and so now we just need to get things ready to pour a slab in the remaining 3 modules. I'll explain later why we do the slabs after the concrete walls and concrete ceiling.
In order to have a standard 4-inch thick slab, and have it cure uniformly, it's necessary to level the sand base for the concrete to be poured. This means setting up a laser level and then walking around the room with a stick (we're using a tamper that helps compact the sand, but has a line on it that we use to tell with the laser if we're low or high in that spot). We rake and/or shovel sand to low spots and rake off areas where it's too high. We're almost done.
As a re-cap, we got the slab in the garage poured a year or so ago. That allowed us to close in the garage and it has been a place that we could lock and secure building materials and tools for the rest of the construction. The remaining 3 modules had more utility work to be done, but we've gotten that done and now we're hoping to pour the remaining slabs in mid-October.
The reason we are doing the slabs now, rather than before the walls and roof were poured, is that with a concrete house, if we had poured the slabs first, then when we put the forms in to hold up the roof for pouring that concrete, the weight of the roof concrete would've definitely broken our slab. To prevent that the walls and roof are poured in one pour. The slabs are poured later.
Anyway, I hope that explains it. I hope to write more as we progress. We took a few photos. Rather than use my fancy camera, we just went in and took a few photos with our new phone cameras. I've posted a full set of photos on my flickr site.
Thursday, July 1, 2010
I Quit
I figure that I'll change my mind this fall, but for the summer, I'm done.
I have tried for over a month to get the sand that I need to continue work. I'm wanting to get this in the area where I can level it out over our utility lines and pour a slab for the floor.
It took 2 weeks because of weather and because of an unreliable dirt contractor. At first, the issue was that the sand was wet and so he couldn't deliver a full load because of the weight of the truck. I understand that but when it dried out days later, he kept saying they'd deliver the next day and didn't. After repeated calls, finally, 2 weeks later, it was delivered, and it was mostly clay, not sand like I had asked.
He had decided (for me) that although I asked for sand, what I really wanted was this stuff. He'd asked what I was doing to use it for, and he decided that he knew better what I needed.
So I asked for another load of sand and over 2 weeks later, it got delivered this day, and it was the same stuff as before. Crap!!!
I've been looking in the phone directory for another supplier in the area and there aren't that many. I finally got a hold of one this morning and the first thing he asked when I told him what I wanted as "what are you going to use it for?" I replied, "Never mind" and I hung up the phone.
I'm done. I've paid $260 dollars for clay that is of no use to me right now. Once it is dumped out of their truck, it's not like I can scoop it back up and send it back with them. I just can't seem to get the material I want, and I'm unwilling to use their clay for my application. I've tried. I've honestly tried.
My problem in the floor is that I spread the stuff and then try to compact it, but it sticks to the tamping tool that I use to compact it with. So I can't get a good level surface. It's taking me 3 to 4 times as long to get a level area for the slab, and I'm doing the work alone. I have no help. So I'm done. I quit. I don't know if I will resume work or not. It's quite possible that this house will never be completed. However, it's also possible that I will have a change of heart in the Fall. Right now, it's hot out there on the site, and I'm tired of struggling with inferior product, and I can't get the product that I repeatedly ask for.
Tuesday, June 29, 2010
Slow
Friday, July 17, 2009
Poured the Garage floor (finally)
Our goal right now is to get the garage closed in, so that we have a secure place to store tools and materials. We'll pour the slabs for the rest of the house after I finish the utility work that is needed below those slabs.
Saturday, January 3, 2009
Earth Tubes
See our photos on Flickr.
Sunday, October 12, 2008
It Doesn't Feel Like Much Has Been Accomplished Lately
Monday, September 15, 2008
Nothing Got Done This Weekend
Tuesday, September 9, 2008
Worked On the Utility Trenches. Worn Out.
The jackhammer made the work go faster, but I worked hard having to pick the machine up and move it around. The boulders had to be cut through though, and this area of the property probably has the biggest boulders we have. They were thick and wide.
At the end of the day, Rachel asked me if this was the right tool for the job. I said that "for this job" it was, because of having to be careful and not damage existing utility lines and the well. However, if it hadn't been for those, the right tool for the job was a backhoe.
Tuesday, September 2, 2008
August Was a Slow Month
Anyway, there was the grand opening of the BOK Center in Tulsa. I took a few photos. (Click here to see). That was last Saturday.
I'm back on the utilities chore and feeling the need to get this done so that we can berm some more (and that area will be buried, so it's important to get the utilities done first), so we can finish the waterproofing and get the roof covered before winter.
And nothing has been done about the slab or any utilities within the house. I do have all the utilities done in the garage though.
We did some trim work in the current house. After living in the house for almost 4 years, Rachel felt like we should finish some of the trim. So we've done that work and it was easier (and cooler) than working outdoors.
With August behind us, I'm feeling the urgency to get back to work on our new house.
Thursday, August 14, 2008
Why Is It Difficult To Get Contractors?
As it turns out, we pay or are willing to pay, the same as amount as what these guys are getting through their commercial building customers. The difference is that their commercial building customers are a source for repeat business, whereas we are not. Therefore, if they aren't busy, they'll do work for us, but otherwise, we're going to keep getting pushed to the back of the queue as far as when they can work.
So it stands to reason that we've had trouble. In comparing notes with other people I know in the area, who are also building (or have built) their own homes, it has been the same experience for them. The best luck they've had is to pay for day labor and supervise closely.
Saturday, August 2, 2008
Still Rushed but Not Stressed
After further consideration, and talking it over with Rachel, we decided that the money we were going to be paying for waterproofing help, and slab prep, was going to be a whole lot of money for not a lot. It was going to be a lot in terms of progress that I have not been able to make on my own, but it was going to use up the rest of our money and wasn't a lot of value added.
So Rachel decided that she'll help me. We're getting a list of things to do and products to buy, and looking to hire some local help. Our plan is to get the waterproofing done in a weekend in August (before the rains come in the Fall), and get the roof covered as soon as possible. This will be some dirt work. I'll have to buy dirt as well as get someone to help move the dirt we have up against the house and get the berming completed.
Likewise, some local help can get us the slab prep work we need, and with Rachel's help, I can get the phonecalls made, the workers lined out and all the things done that I couldn't do and hold down a job at the same time.
This will save us a lot of money, which I feel a lot better being able to save and spend somewhere else (on the house, of course). Rachel is happier about it. I don't think Ralph Smoot (the guy in the Austin area that was going to help us) is happy about it. He's not returning my e-mails right now and there've been no phone conversations since our decision either.
I had literally planned to get him to do the work up until dinner lastnight after work. I had the contract printed out. I had already given Ralph our address and instructions on how to find the place, so that they could have materials delivered. All that remained was me provide a check and the signed contract, which I was going to Fedex for a Monday delivery.
At dinner, Rachel said she didn't feel comfortable with that decision and felt that it was an awful amount of money for what we'd be getting.
I can definitely say that this was nothing against Ralph or his son Conrad. It was a money issue. I wanted to get the work done, but I didn't like the idea of being out of money afterwards. This way, it'll probably take us longer to get this stuff done, but we'll have the money left to go further on construction than we would have been able to otherwise.
I still haven't gotten a return call from Jay Scafe (@ Terra-Dome) because I had wanted to check and see if he had anyone to help us with the waterproofing, and what they might charge. If it was a better price, we would entertain that solution for certain. The thing is, Jay hasn't returned our calls. He's either out of town, or just not checking his voice-mail yet.
Thursday, July 31, 2008
Feeling Rushed & Stressed
I'm feeling rushed. I'm under a lot of pressure. It feels overwhelming, but I have to do this.
I have a unique opportunity to make some great progress in a short amount of time on the house. However, this comes with a cost. Money. And we're almost out of it. So I've had to ponder this to decide what to do, and I don't have a lot of time to make the decision.
Ralph Smoot and his son Conrad (see http://www.earthshelteredhome.com) have proposed to come and help us get our waterproofing done, as well as helping me finish the slab prep work so that I can pour the floor concrete. The thing is, they have a tight schedule and I feel rushed.
Ralph is proposing that they come out in a couple of weeks. I think this is good for their schedule, but he also says that it'll get in before the rain returns in the fall, and it'll give the waterproofing time to cure a bit before winter.
I have some factors that stress me out on this.
1. It's a lot of money, but the good thing is that it's a great amount of progress in a small amount of time.
2. Once the waterproofing is down, we've got to protect it, so it has to be buried within a few weeks. We have to get the place bermed and the roof covered. (but we can't do that until the floors are poured).
3. Ralph recommends no berming until the floor concrete is in (for wall stability). So once the waterproofing is done, we're committed.
4. We are running low on money.
5. There is an enormous amount of floor prep that I don't think Ralph realizes, although I've documented it for him extensively. It may be that he doesn't consider it to be as big an obstacle as I do, although his price for helping me on this aspect is minimal. It's worth the money.
6. I work during the day and haven't had time to devote to calling slab contractors to see what their labor will run.
7. I'll have to purchase rebar and get that delivered to the site, and I'm not sure what 3800 feet of #3 rebar is going to run (yet).
8. We're running low on money.
There's a great opportunity here. By the end of August, we could be months and months ahead of where we'd otherwise be. It's just that we'll also be out of money so work will slow down after this temporary surge in progress.
Sunday, July 27, 2008
Garage Sub-Floor is Virtual Done
We did it. With Rachel's help this weekend, we were able to finish the work in the sub-floor of the garage. I barely have 30 minutes of work (maybe less) left, but it was just too hot (over 100F in the shade) to finish the work today. It was 17:00 and time to quit.
We got a lot done. We have a supply line for running electricity from a backup generator, if we ever get one. It wont have to be retrofitted later. The conduit is already there.
We put in an earth tube and have a much shorter one to install, which will only take me a few minutes on another day. The earth tube (sometimes called a cooling tube) is for virtually free airconditioning. In our case, it wont be completely passive due to the fact that we wont really have a chimney effect, so for the system to work, we will be installing a small fan in the system (so it wont really be completely free, but it'll be low cost).
See http://mb-soft.com/solar/saving.html This site tells about an earth tube system that we really like. We've read about earth tubes for years but never quite found a solution that would prevent mold and/or mildrew from growing inside the tubes. This system does that, due to sloped pipe and a place to draw off moisture at the lowest point, and sumped from a drywell nearby.
As stated, we installed the tube in the floor. This will be for bringing in cold air to the garage (it could later be converted to living quarters, so having A/C felt like a good measure to add to the garage before the garage floor gets poured.
A second tube (closer to the exterior) will be installed as a "return" air duct. These are 4 inch pipes that are a part of a closed-loop system for air circulation and cooling. The pipes will be connected to a series of pipe run out into our pasture, approximately 4 or 5 feet deep, and then looped back to the house. A complete loop, where warm air enters the 'return' pipe, goes through the earth and is cooled and brought back into the house through the other pipe, being drawn through with a small fan.
The system works in other homes and it'll work for us too.
The garage will have its own fan for circulation, but when we install these same type of pipes for the rest of the house, they'll be run via a whole house ventilation system that will also have a filter and possibly a dehumidifier if we feel necessary.
Anyway, we got the work done. Only the return pipe is left to do. I can do that one evening this week.
I'm very pleased at where we've gotten progress, but frustrated that it has taken so long to get here. I am looking to get some help. Help is hard to get, because you want someone that knows what they need to do in one of these types of houses, and not just anyone can do that. I think I might be able to get some expertise though and it might not be cost prohibitive. I'll know for sure in a few days (I hope).